FACTORY ALTERATIONS IN SHERBURN-IN-ELMET FOR CRANSWICK FOODS
FACTORY ALTERATIONS IN SHERBERN-IN-ELMET PROJECT OVERVIEW
Premium food producer Cranswick Foods appointed FSC to deliver internal factory alterations at its Sherburn-in-Elmet production facility.
Due to evolving operational demands, the client required a reconfiguration of their internal layout to expand packing operations. FSC reduced the footprint of the existing dry storage area to create additional packing space, alongside installing fire-rated wall systems to enhance safety and compliance.
The project was delivered within a live food production environment with minimal disruption to ongoing operations.
![]()
LOCATION: Sherburn-in-Elmet
SECTOR: Food Manufacturing
SERVICE: Factory Upgrade & Reconfiguration
The Client’s Challenge
Cranswick required:
- Increased packing capacity within the existing facility footprint
- Reduction and reorganisation of dry storage space
- Installation of fire-rated partition walls
- Improved health and safety infrastructure
- Works delivered within a live operational factory
The alterations were needed to balance operational efficiency with strict food production and fire safety standards.

Our Solution
FSC delivered a structured internal alteration programme including:
- Reconfiguration of dry storage and packing zones
- Structural steel framework to create new internal divisions
- Installation of food-safe and fire-retardant wall systems (1-hour fire rating)
- Suspended ceiling installation within the new packing area
- Segregated working areas to allow continued factory operations
All works were carefully phased to ensure production continuity.

Completed suspended ceiling installation in the new packing area.

A steel frame was erected to separate sections of the factory. In addition to this, the installed walling is both food safe and fire retardant for 1hr.

Cranswick employees were segregated, allowing works to occur without disruption to business operations.
Project Outcomes / Benefits:
The completed alterations delivered:
- 40% increase in packing area capacity
- Improved operational efficiency within the facility
- Enhanced fire protection and compliance
- Strengthened health and safety infrastructure
- Continued production with minimal disruption
The upgraded layout now supports greater throughput and long-term operational growth.
Planning Internal Factory Alterations?
FSC delivers compliant factory alterations, packing area expansions and fire-rated partition installations within live food production environments. Our experienced team manages layout reconfigurations efficiently while maintaining operational continuity.
Contact FSC today to discuss your factory alteration project.


