FACILITY EXTENSION IN BEVERLEY FOR FABRICS UK

FACILITY EXTENSION IN BEVERLEY PROJECT OVERVIEW

Fabrics UK, based in the East Riding of Yorkshire, appointed FSC to deliver an industrial unit extension and infrastructure upgrades at their Beverley production facility.

Due to increased production demand, the client required additional storage capacity, improved drainage systems and an expanded external service yard. FSC delivered a comprehensive extension project including the construction of two new storage units, a connecting link corridor, bespoke drainage infrastructure and external yard works.

The completed project provides scalable capacity and modernised site infrastructure to support continued operational growth.

Fabrics UK logo

LOCATION: Beverley

SECTOR: Textiles Manufacturing

SERVICE: Industrial Unit Extension & External Infrastructure Works

The Client’s Challenge

Fabrics UK required:

  • Additional internal storage capacity
  • A seamless extension connected to the existing facility
  • Modern, environmentally responsible drainage infrastructure
  • Increased external service yard space
  • Secure access points for operational use

The solution needed to integrate with the existing production facility while supporting long-term expansion.

Our Solution

FSC delivered a full industrial construction and infrastructure package, including:

  • Construction of two new storage units
  • Installation of a link corridor connecting new and existing buildings
  • Bespoke drainage system including:
    • Containment tank
    • Flow resistance system
    • Pump chamber
  • Extension of the external service yard
  • Installation of a reinforced concrete retaining wall
  • Tarmac surfacing for long-term durability
  • Reinforced concrete flooring internally
  • Racking installation within the new storage space
  • Corrugated steel external wall cladding to match the existing facility
  • Roller shutter door installation for secure access

The result was a compliant, efficient and future-ready production environment.

Bespoke drainage system installation during the construction phase.

Fabrics UK Internal Works

Reinforced concrete flooring and racking installation.

Fabrics UK link corridor

Link corridor connecting the existing facility to the extension.

Fabrics UK Tarmac External Yard

Tarmac-finished service yard for long-term durability.

Corrugated steel external wall cladding to match the existing facility.

Roller shutter Doors at Fabrics UK

Roller shutter door installation for secure access.

Project Outcomes / Benefits:

The completed extension delivered:

  • Increased internal storage capacity
  • Modernised, environmentally improved drainage system
  • Expanded external yard for vehicle and material storage
  • Improved operational flow between buildings
  • Enhanced site security

Fabrics UK now benefits from a scalable and future-ready production environment.

Planning an Industrial Extension or Infrastructure Upgrade?

FSC delivers industrial unit extensions, drainage systems, reinforced concrete works and external yard construction for manufacturing and production facilities. From groundworks to full building extensions, our team provides robust, compliant solutions tailored to operational growth.

Contact FSC today to discuss your industrial expansion project.

Related Projects
Contact Us

Don't hesitate to contact our friendly team by calling 01472 355454, or use the contact form below.

Not readable? Change text. captcha txt
Aunt Bessie's external cladding Call Today