CANTEEN INSTALLATION IN GRIMSBY FOR HILTON SEAFOOD

CANTEEN INSTALLATION IN GRIMSBY PROJECT OVERVIEW

Hilton Seafood (formerly Seachill) appointed FSC to deliver a new staff canteen installation at their Grimsby production facility.

As part of a wider internal reconfiguration programme, the existing ground-floor office space was relocated to the first floor to allow for the construction of a purpose-built canteen environment. The objective was to improve staff welfare by providing hot meal facilities and a dedicated breakout space.

The completed project delivers a functional, welcoming and strategically located canteen designed to enhance employee experience within a live production environment.

Hilton Seafoods Logo

LOCATION: Grimsby

SECTOR: Food Manufacturing

SERVICE: Staff Canteen Fit-Out & Internal Reconfiguration

The Client’s Challenge

Hilton Seafood required:

  • Relocation of existing ground-floor office space
  • Reconfiguration of internal layout
  • Construction of a purpose-built staff canteen
  • Facilities capable of supporting hot meal provision
  • An improved welfare environment for employees
  • Minimal disruption to ongoing factory operations

The solution needed to be practical, compliant and positioned for optimal staff access.

Seafood Factory Canteen

Our Solution

FSC delivered a comprehensive internal alteration and fit-out package including:

  • Strip-out of existing ground-floor offices
  • Relocation of office facilities to the first floor
  • Construction of a custom canteen environment
  • Installation of durable, easy-to-maintain finishes
  • Creation of a practical and welcoming staff space

The new layout was carefully planned to ensure efficient staff flow while maintaining operational continuity within the factory.

Seafood Factory Canteen

Seafood Factory Canteen2

Seafood Factory Canteen

Project Outcomes / Benefits:

The completed canteen installation delivered:

  • A purpose-built hot meal facility

  • Improved staff welfare provision

  • A more engaging breakout environment

  • Increased morale and employee experience

  • Enhanced internal space utilisation

Hilton Seafood now benefits from a modern staff facility aligned with workforce wellbeing and operational efficiency.

Upgrading Staff Welfare Facilities?

FSC delivers internal reconfigurations, staff canteen installations and welfare facility fit-outs within live industrial environments. From strip-out to complete refurbishment, our team provides practical, high-quality solutions tailored to operational needs.

Contact FSC today to discuss your facility upgrade.

Related Projects
Contact Us

Don't hesitate to contact our friendly team by calling 01472 355454, or use the contact form below.

Not readable? Change text. captcha txt
Seafood Factory Office breakout zone Call Today