Factory Extension Project in Huddersfield for Damika

FACTORY EXTENSION IN HUDDERSFIELD PROJECT OVERVIEW

FSC was appointed to deliver a design and build factory extension in Huddersfield for premium bacon producer DAMIKA. The objective was clear: increase production capacity and improve loading efficiency to support continued business growth.

By managing both the design and construction phases, FSC provided a streamlined solution that accelerated delivery and ensured operational requirements were met from day one.

Damika, FSC Clients

LOCATION: Huddersfield

SECTOR: Food Manufacturing

SERVICE: Design & Build Factory Extension

The Client’s Challenge

DAMIKA required:

  • Increased packing and production space

  • Improved loading and distribution efficiency

  • A solution that minimised operational disruption

  • A single contractor to manage the full project lifecycle

Their existing facility was limiting productivity, and inefficiencies within the loading process were impacting turnaround times.

Single skin exterior wall cladding at the damika factory

Our Solution

Concrete reinforcement during the initial construction stage at the DAMIKA factory extension project in Huddersfield

Concrete reinforcement, strengthening the extenstion’s structural foundation.

Dock leveller installation during the construction phase of the DAMIKA factory extension project in Huddersfield

Dock leveller installation, improving loading efficiency and workflow.

Completed erection of steelwork during the construction phase of the DAMIKA factory extension project.

Steelwork erection, forming the structural framework of the factory extension.

Loading bay at DAMIKA, Huddersfield during their factory extension project.

Loading bay installation, enhancing product movement and operational efficiency.

Interior shot of the almost completed Factory extension at DAMIKA

Interior fit-out, creating functional and efficient factory spaces.

Single skin exterior wall cladding at the damika factory

External wall cladding, creating a durable and protective factory exterior finish.

Project Outcomes / Benefits:

  • Increased packing capacity – 178 sqm of additional floor space for production.

  • Faster loading processes – dock leveller reduces loading time by up to 50%.

  • Enhanced workflow – improved internal layout and operational efficiency.

  • Durable infrastructure – steel framework and concrete reinforcement ensure long-term reliability.

  • Modern factory facilities – new interior fit-out and external cladding support hygiene and aesthetics.

Ready to Transform Your Facility?

FSC specialises in delivering bespoke factory extensions, internal fit-outs, and structural improvements. Whether you need to increase production capacity, improve workflow, or modernise your facility, our experienced team can guide your project from design through to completion. Contact us today for a no-obligation consultation and see how we can help your business grow.

Related Projects
Contact Us

Don't hesitate to contact our friendly team by calling 01472 355454, or use the contact form below.

Not readable? Change text. captcha txt
PVC hygienic Wall cladding in food factory Call Today